01
Project & Building
Basic site identification
02
Installation Space
Where the unit physically goes
Outdoor β additional checks
03
Power & Security
Utilities and site oversight
04
Photos β Before Installation
Three required angles of the empty space
1. Front view
0 photos added
2. Right side view
0 photos added
3. Left side view
0 photos added
05
Design / Wrap Needs
Cosmetic finishing requirements
06
Schedule & NOC Status
Timing and approval
Long-term contract details
07
Units Installed
Enter quantity of each model β sizes are fixed, no need to count manually
Total compartments (calculated)
Editable below if final count differs
0
Large
0
Medium
0
Small
0
X-Small
0
08
Photos β After Installation
Same three angles β confirm final placement, level, cable routing, wrap
1. Front view
0 photos added
2. Right side view
0 photos added
3. Left side view
0 photos added
09
Sign-off
Whoever is on-site today signs their part β survey and install can be different people, different visits